ยป Everything is back ordered....tradie life, dear diary
  1. Results 1 to 16 of 16
post 1661538083 05-18-2022, 08:28 PM
-
#1
  1. Johnez
  2. Registered User
  1. Johnez
  2. Registered User
  3. Join Date: Jul 2019
  4. Age: 56
  5. Posts: 12,771
  6. Rep Power: 87772

Everything is back ordered....tradie life, dear diary

I work maintaining and fixing soda fountains and related stuff....and half of my parts are on back order. This crap isn't uncommon, but it's getting insane now. The most basic parts have been out for weeks. It's been bad for months, but now it's getting really bad. Our weekly meeting brought up how to locally source from other techs LMAO, brb let's cannibalize each other's trucks....when none of us have jack sheit.

Fuk me it's getting stressful. Should have jumped ship when I had the chance.
Virtue is its own reward.
post 1661549153 05-19-2022, 04:59 AM
-
#2
  1. userCMNWN6Z4V3S
  2. Hi test
  1. userCMNWN6Z4V3S
  2. Hi test
  3. Join Date: May 2021
  4. Posts: 883
  5. Rep Power: 7005
Same for me, commercial refrigeration owner. Things I used to get next day now have lead times two three weeks. If not two three months
post 1661549283 05-19-2022, 05:05 AM
-
#3
  1. EDcellent
  2. You too
  1. EDcellent
  2. You too
  3. Join Date: May 2009
  4. Location: Connecticut, United States
  5. Posts: 14,086
  6. Rep Power: 140306
I repair and rebuild Caterpillar engines, part shortages are affecting us too. We end up building engines halfway, then have to work on testing down another one.
post 1661549303 05-19-2022, 05:07 AM
-
#4
  1. AlwaysFocus
  2. Registered AI
  1. AlwaysFocus
  2. Registered AI
  3. Join Date: Sep 2016
  4. Location: BC, Canada
  5. Posts: 43,341
  6. Rep Power: 354666
Biden boom bros
post 1661549373 05-19-2022, 05:12 AM
-
#5
  1. x-trainer ben
  2. Registered User
  1. x-trainer ben
  2. Registered User
  3. Join Date: Oct 2005
  4. Location: United States
  5. Posts: 62,386
  6. Rep Power: 451180
China has some Covid issues now and parts are made in China mostly, buckle up.
There is an unspoken thing, we are iron brothers and sisters, we are to support each other and...It is our duty to support our brothers and sisters in the iron game!
post 1661550753 05-19-2022, 06:05 AM
-
#6
  1. NMH
  2. PSU Crew
  1. NMH
  2. PSU Crew
  3. Join Date: Sep 2007
  4. Location: Pennsylvania, United States
  5. Posts: 5,736
  6. Rep Power: 23649
Originally Posted By AlwaysFocus
Biden boom bros
The biden ka-boom. We are seeing it in the construction industry as well. Like Cat brah said above, parts for machines, pipe fittings, ductile iron pipe, etc. 10+ months out and thatโ€™s just a guess. On top of it, our dumbass in chief is helping the fuel cost rise and nothing gets built, delivered, minerals mined, etc without diesel fuel. **** is gonna come to a screeching halt soon it feels like and we will be super fukked
MFC

RIP YGST

**KNEE DRAGGERS CREW**

O's/Ravens/Caps
post 1661550873 05-19-2022, 06:09 AM
-
#7
  1. RICHSTRONG
  2. Pa BITCHES
  1. RICHSTRONG
  2. Pa BITCHES
  3. Join Date: Mar 2012
  4. Location: United States
  5. Height: 6'2"
  6. Weight: 350 lbs
  7. Posts: 85,315
  8. Subscribers: 14
  9. Rep Power: 1662585
C'mon guys. Biden's trying to get a chip plant up and running in Ohio...this should help.
See monster0ultra's sig
post 1661550913 05-19-2022, 06:10 AM
-
#8
  1. DesiredUserphag
  2. 1:12TilTheDayIFukinDie
  1. DesiredUserphag
  2. 1:12TilTheDayIFukinDie
  3. Join Date: Sep 2014
  4. Posts: 40,176
  5. Rep Power: 397140
Explains why one of our soda machines in the office has been out of order for 4 months now
๐—ฃ๐—จ๐—ฅ๐—˜๐—•๐—Ÿ๐—ข๐—ข๐——
ฯ‰ฯƒัโ„“โˆ‚ ั‚ัฮฑฮฝั”โ„“ั”ั ศผัั”ฯ‰ โ‚…โ‚€/โ‚โ‚‰โ‚…
๐•ฌ๐–Š๐–˜๐–™๐–๐–Š๐–™๐–Ž๐–ˆ๐–†๐–‘๐–‘๐–ž ๐•ฎ๐–š๐–™ ๐•ธ๐–†๐–˜๐–™๐–Š๐–— ๐•ฝ๐–†๐–ˆ๐–Š ยฎ
แ—ชIแ”•แ‘•แ–‡Iแ—ฐIแ‘Žแ—ฉTIOแ‘Ž Eแ™ญแ‘•แ’ชแ‘Œแ”•IOแ‘Ž Iแ‘Žแ—ชOแ‘•Tแ–‡Iแ‘Žแ—ฉTIOแ‘Ž
post 1661551163 05-19-2022, 06:16 AM
-
#9
  1. naich
  1. naich
  2. Join Date: Nov 2011
  3. Posts: 17,194
  4. Subscribers: 3
  5. Rep Power: 128282
Stuff that took a week to get now takes 3 months, followed by a call at the third month saying gives us two more weeks. Most customers get it because they are in the mix, but some don't get it and its a hard sell to tell someone its going to be 4 months for a basic part.

All because China is going "covid zero"? After everything we all know as a world about this thing, 2.5 years in and they are shooting for "zero cases" lmaowut? They are trolling us. They country with the longest exposure to this thing has the worst policy 2.5 years later...hard to believe. Somethingaintright.gif.
**Florida Crew**
**Waiting for National Guard Bus Ride to Labor Camp Crew**
post 1661551233 05-19-2022, 06:18 AM
-
#10
  1. Goat_187
  2. Registered User
  1. Goat_187
  2. Registered User
  3. Join Date: Nov 2008
  4. Location: Miami, Florida, United States
  5. Age: 40
  6. Posts: 26,316
  7. Rep Power: 93130
Thanks Obama
post 1661551353 05-19-2022, 06:24 AM
-
#11
  1. JeepBruh
  2. Platinum
  1. JeepBruh
  2. Platinum
  3. Join Date: Aug 2019
  4. Posts: 12,130
  5. Subscribers: 2
  6. Rep Power: 145845
Originally Posted By EDcellent
I repair and rebuild Caterpillar engines, part shortages are affecting us too. We end up building engines halfway, then have to work on testing down another one.
Build back better!
post 1661551393 05-19-2022, 06:26 AM
-
#12
  1. PAU1
  2. โŒ›
  1. PAU1
  2. โŒ›
  3. Join Date: Mar 2010
  4. Posts: 14,416
  5. Rep Power: 342554
I signed the order for a specialty fleet vehicle in April of โ€˜21 but it has yet to be delivered. Sadly, I expect this to worsen.
Originally Posted By naich
Stuff that took a week to get now takes 3 months, followed by a call at the third month saying gives us two more weeks. Most customers get it because they are in the mix, but some don't get it and its a hard sell to tell someone its going to be 4 months for a basic part.

All because China is going "covid zero"? After everything we all know as a world about this thing, 2.5 years in and they are shooting for "zero cases" lmaowut? They are trolling us. They country with the longest exposure to this thing has the worst policy 2.5 years later...hard to believe. Somethingaintright.gif.
Theyโ€™re exploiting our dependency to further wreck us and Xiden isnโ€™t going to break hard on the CCP.
post 1661551673 05-19-2022, 06:37 AM
-
#13
  1. NitrogenWidget
  1. NitrogenWidget
  2. Join Date: Dec 2010
  3. Location: United States
  4. Posts: 43,261
  5. Subscribers: 1
  6. Rep Power: 349299
Originally Posted By userCMNWN6Z4V3S
Same for me, commercial refrigeration owner. Things I used to get next day now have lead times two three weeks. If not two three months
know a guy who services AC units.
he doesn't even bother trying to get parts from manufacturers and just goes to the local parts place and buys whatever part has the same specs and makes it fit.
post 1661551753 05-19-2022, 06:39 AM
-
#14
  1. scooterbrah
  2. Registered Pureblood
  1. scooterbrah
  2. Registered Pureblood
  3. Join Date: Jan 2011
  4. Location: Scottsdale, Arizona, United States
  5. Posts: 22,464
  6. Rep Power: 308215
tradie herder checking in

we have stuff thats currently a 50-60 week leadtime.


its pretty funny when a customer says/demands they need their project done by september and we tell them we wont even have all the materials until july of next year
MinisterOfLust: scooterbrah and Mcfreoko are the two worst posters here.
post 1661552133 05-19-2022, 06:52 AM
-
#15
  1. kcadrenalin
  2. Permanent Vacation
  1. kcadrenalin
  2. Permanent Vacation
  3. Join Date: Jun 2007
  4. Posts: 24,727
  5. Rep Power: 349124
Originally Posted By scooterbrah
tradie herder checking in

we have stuff thats currently a 50-60 week leadtime.


its pretty funny when a customer says/demands they need their project done by september and we tell them we wont even have all the materials until july of next year
I can relate. A lot of projects and products that I would normally be quoting 8-12 weeks out are now early next year. People freak and say they will have to go with someone else only to call back in a few days after finding out that everyone is having the same issues. Now I am having to call customers to tell them that the freight I quoted 4 months ago has gone up $900.00 (or whatever) and they have to pay the difference before I can ship their order. Needless to say I get yelled at a lot. LOL
________

MFC

________
Democracy is two wolves and a lamb voting on what to have for lunch. Liberty is a well-armed lamb contesting the vote. -Benjamin Franklin
Tits and Beer
post 1661552163 05-19-2022, 06:54 AM
-
#16
  1. exxtracool
  2. Registered User
  1. exxtracool
  2. Registered User
  3. Join Date: Jan 2018
  4. Location: Canada
  5. Age: 34
  6. Posts: 20,766
  7. Rep Power: 77972
Originally Posted By x-trainer
China has some Covid issues now and parts are made in China mostly, buckle up.
Yeah. Huge delays from china for their stuff. Anything you need thats cheap and plastic will have to wait a while.
Quick Navigation Top Misc
Bookmarks
Digg.com
Digg
del.icio.us
del.icio.us
Stumbleupon.com
StumbleUpon
Google.com
Google
Facebook.com
Facebook
Posting Permissions
  1. You may not post new threads
  2. You may not post replies
  3. You may not post attachments
  4. You may not edit your posts