Forum
»
Got my new tradie install/service van setup
21 hours ago, 01:22 PM
-
#31
21 hours ago, 01:23 PM
-
#32
Question
If I buy 3 toilets and I hire a tradie to install them, how much would you charge?
If I buy 3 toilets and I hire a tradie to install them, how much would you charge?
Fk the Good Poster Crew (Lockdev, Pink, Kimm, Wasps, Expatriot, Mulloway, Luc1fer, Smallpeter, gwg, Super Hercules, Bonobo, maori-rap, Based Bagel, ezmac31, Goobaa, Godfrd and many more). You know who you are.
21 hours ago, 01:24 PM
-
#33
21 hours ago, 01:26 PM
-
#34
- Jughead96
- The Incredible JUG
-
- Jughead96
- The Incredible JUG
- Join Date: May, 2026
- Posts: 2,322
- Subscribers: 8
- Rep Power: 59808
-
-
Originally Posted By taskmob⏩
That’s probably about 4 hours of work for the lad. So like 300-400$ plus tax unless paid in cash(we like cash, us tradies)
Question
If I buy 3 toilets and I hire a tradie to install them, how much would you charge?
If I buy 3 toilets and I hire a tradie to install them, how much would you charge?
Of course something can go very wrong during installation and turn it into a 1500 job
When he regains consciousness, double the voltage.
21 hours ago, 01:27 PM
-
#35
- GooBaaa
- Join Date: Sep 2011
- Location: Buffalo NY
- Posts: 58,750
- Subscribers: 5
- Rep Power: 434103
-
-
Originally Posted By Jughead96⏩
It’s like 30 minutes a toilet as long as the flange ain’t busted
That’s probably about 4 hours of work for the lad. So like 300$ plus tax unless paid in cash(we like cash, us tradies)
21 hours ago, 01:29 PM
-
#36
- LDARidonot
- Join Date: Mar 2016
- Location: United States
- Posts: 2,150
- Subscribers: 4
- Rep Power: 42801
-
-
Originally Posted By GooBaaa⏩
The hell boyo, it's not rocket science. The wax ring is the hardest part.
$300 a toilet. Cash only too
21 hours ago, 01:29 PM
-
#37
- Jughead96
- The Incredible JUG
-
- Jughead96
- The Incredible JUG
- Join Date: May, 2026
- Posts: 2,322
- Subscribers: 8
- Rep Power: 59808
-
-
Originally Posted By GooBaaa⏩
Do you like cash payment more than wire or checks?
It’s like 30 minutes a toilet as long as the flange ain’t busted
When he regains consciousness, double the voltage.
21 hours ago, 01:30 PM
-
#38
21 hours ago, 01:32 PM
-
#39
- LDARidonot
- Join Date: Mar 2016
- Location: United States
- Posts: 2,150
- Subscribers: 4
- Rep Power: 42801
-
-
Originally Posted By Zere0wn⏩
True. It's all a pita
if people are dumb/lazy enough to pay it, I don't blame him
20 hours ago, 01:34 PM
-
#40
20 hours ago, 01:34 PM
-
#41
20 hours ago, 01:37 PM
-
#42
- Jughead96
- The Incredible JUG
-
- Jughead96
- The Incredible JUG
- Join Date: May, 2026
- Posts: 2,322
- Subscribers: 8
- Rep Power: 59808
-
-
Originally Posted By GooBaaa⏩
Same. Anything other means a godly higher number for tax and that varies whether I’m selling a product or just doing a job
Yah cash is preferred if it’s a check I always charge more. I don’t take credit cards
When he regains consciousness, double the voltage.
20 hours ago, 01:39 PM
-
#43
- LDARidonot
- Join Date: Mar 2016
- Location: United States
- Posts: 2,150
- Subscribers: 4
- Rep Power: 42801
-
-
Originally Posted By Zere0wn⏩
One of the hardest is finding a water leak in the line
if you can lift it, toilet is legit one of the easiest diy projects though
20 hours ago, 01:42 PM
-
#44
20 hours ago, 01:48 PM
-
#45
- LDARidonot
- Join Date: Mar 2016
- Location: United States
- Posts: 2,150
- Subscribers: 4
- Rep Power: 42801
-
-
Originally Posted By Zere0wn⏩
If you ever do, save a bunch of time and hassle and hire somebody that locates lines, exclusively. It's probably pvc, so a metal detector is out. And of course, it's probably buried deep as heck if you live above a frost zone
hope I never have to
20 hours ago, 02:05 PM
-
#46
Originally Posted By GooBaaa⏩
LMFAO, fuck that I'd figure it out myself
$300 a toilet. Cash only too
Fk the Good Poster Crew (Lockdev, Pink, Kimm, Wasps, Expatriot, Mulloway, Luc1fer, Smallpeter, gwg, Super Hercules, Bonobo, maori-rap, Based Bagel, ezmac31, Goobaa, Godfrd and many more). You know who you are.
20 hours ago, 02:06 PM
-
#47
Originally Posted By Jughead96⏩
$300 for the whole job sounds fair. $300 per toilet is ridiculous.
That’s probably about 4 hours of work for the lad. So like 300-400$ plus tax unless paid in cash(we like cash, us tradies)
Of course something can go very wrong during installation and turn it into a 1500 job
Of course something can go very wrong during installation and turn it into a 1500 job
Fk the Good Poster Crew (Lockdev, Pink, Kimm, Wasps, Expatriot, Mulloway, Luc1fer, Smallpeter, gwg, Super Hercules, Bonobo, maori-rap, Based Bagel, ezmac31, Goobaa, Godfrd and many more). You know who you are.
19 hours ago, 03:17 PM
-
#48
18 hours ago, 03:41 PM
-
#49
- LDARidonot
- Join Date: Mar 2016
- Location: United States
- Posts: 2,150
- Subscribers: 4
- Rep Power: 42801
-
-
Originally Posted By GooBaaa⏩
I am. These new clients are awesome. $100 is the sweet spot
Nobody is installing three toilets for $300
18 hours ago, 04:19 PM
-
#50
Just laid out a chiller plant.
I'm just not thrilled of the idea of dealing with homeowners full time.
Plus, I still enjoy big jobs with the right people. Makes the day go by fast.
That, added in with seeing the final product of a commercial install is still satisfying.
Maybe when I cash out my retirements I'll start doing it part time just for extra cash.
I'm just not thrilled of the idea of dealing with homeowners full time.
Plus, I still enjoy big jobs with the right people. Makes the day go by fast.
That, added in with seeing the final product of a commercial install is still satisfying.
Maybe when I cash out my retirements I'll start doing it part time just for extra cash.
"I am a rational animal who occupies the intermediary position between angel and beast"
"The upper class is afforded their position by the collective burden the underclass must carry for them"
**Summer Walker Crew**
18 hours ago, 04:24 PM
-
#51
- PrimarisIn
- Join Date: Sep 2018
- Posts: 15,112
- Subscribers: 2
- Rep Power: 244900
-
-
Ever change hot water tanks?
My dad is a plumber and he makes bank for that
My dad is a plumber and he makes bank for that
18 hours ago, 04:28 PM
-
#52
- GooBaaa
- Join Date: Sep 2011
- Location: Buffalo NY
- Posts: 58,750
- Subscribers: 5
- Rep Power: 434103
-
-
Originally Posted By OPGenesis⏩
My last commercial job was a buildout for a restaurant. 1 walk in freezer, 1 walk in cooler, 2 furnaces/coil/condensor, 1 condenser and 5 ceiling cassettes. Best part about doing commercial work is not having to do my own electrical
Just laid out a chiller plant.
I'm just not thrilled of the idea of dealing with homeowners full time.
Plus, I still enjoy big jobs with the right people. Makes the day go by fast.
That, added in with seeing the final product of a commercial install is still satisfying.
Maybe when I cash out my retirements I'll start doing it part time just for extra cash.
I'm just not thrilled of the idea of dealing with homeowners full time.
Plus, I still enjoy big jobs with the right people. Makes the day go by fast.
That, added in with seeing the final product of a commercial install is still satisfying.
Maybe when I cash out my retirements I'll start doing it part time just for extra cash.
Job before that was a brewery that needed a bunch of piping done for the beer room
17 hours ago, 04:36 PM
-
#53
17 hours ago, 04:36 PM
-
#54
Originally Posted By GooBaaa⏩
I hear you. Copper work for me is just boring.
My last commercial job was a buildout for a restaurant. 1 walk in freezer, 1 walk in cooler, 2 furnaces/coil/condensor, 1 condenser and 5 ceiling cassettes. Best part about doing commercial work is not having to do my own electrical
Job before that was a brewery that needed a bunch of piping done for the beer room
Job before that was a brewery that needed a bunch of piping done for the beer room
Last two jobs were commercial heating systems, and I got sick of brazing heating panels in the ceiling.
I still get my dick hard hanging 30" carbon steel still.
Originally Posted By GooBaaa⏩
I remember when I was an apprentice, and my foreman was installing these after work for the high 2,000's.
Yah change them out all the time $1300 for a 40 gallon with a expansion tank
Literally clipping two lines, sliding the new tank under, and pro pressing a couple of couplings lol.
"I am a rational animal who occupies the intermediary position between angel and beast"
"The upper class is afforded their position by the collective burden the underclass must carry for them"
**Summer Walker Crew**
17 hours ago, 04:41 PM
-
#55
- GooBaaa
- Join Date: Sep 2011
- Location: Buffalo NY
- Posts: 58,750
- Subscribers: 5
- Rep Power: 434103
-
-
Originally Posted By OPGenesis⏩
I hear you. Copper work for me is just boring.
Last two jobs were commercial heating systems, and I got sick of brazing heating panels in the ceiling.
I still get my dick hard hanging 30" carbon steel still.
Last two jobs were commercial heating systems, and I got sick of brazing heating panels in the ceiling.
I still get my dick hard hanging 30" carbon steel still.

17 hours ago, 04:42 PM
-
#56
"I am a rational animal who occupies the intermediary position between angel and beast"
"The upper class is afforded their position by the collective burden the underclass must carry for them"
**Summer Walker Crew**
17 hours ago, 04:42 PM
-
#57
- GooBaaa
- Join Date: Sep 2011
- Location: Buffalo NY
- Posts: 58,750
- Subscribers: 5
- Rep Power: 434103
-
-
Originally Posted By OPGenesis⏩
Yah lmao companies near me charge like 2400 and I just can’t do that to people especially on something so basic like a 40 gallon.
I hear you. Copper work for me is just boring.
Last two jobs were commercial heating systems, and I got sick of brazing heating panels in the ceiling.
I still get my dick hard hanging 30" carbon steel still.
I remember when I was an apprentice, and my foreman was installing these after work for the high 2,000's.
Literally clipping two lines, sliding the new tank under, and pro pressing a couple of couplings lol.
Last two jobs were commercial heating systems, and I got sick of brazing heating panels in the ceiling.
I still get my dick hard hanging 30" carbon steel still.
I remember when I was an apprentice, and my foreman was installing these after work for the high 2,000's.
Literally clipping two lines, sliding the new tank under, and pro pressing a couple of couplings lol.
17 hours ago, 04:45 PM
-
#58
- GooBaaa
- Join Date: Sep 2011
- Location: Buffalo NY
- Posts: 58,750
- Subscribers: 5
- Rep Power: 434103
-
-
Originally Posted By OPGenesis⏩
3/4, 1 1/4 and 1 1/2
3/4 copper? lol
You solder all that shit?
You solder all that shit?
Yah I did have to solder everything. The room was supposed to be empty too but they had the tanks in there already so I was climbing on these things trying to get all my piping done. It got to a point where I just did take offs and used some Goodyear hoses since I already knew this shit was gonna get moved again
17 hours ago, 04:47 PM
-
#59
Originally Posted By GooBaaa⏩
I hear you. What you using as supports? Split rings and clevis hangers?
3/4, 1 1/4 and 1 1/2
Yah I did have to solder everything. The room was supposed to be empty too but they had the tanks in there already so I was climbing on these things trying to get all my piping done. It got to a point where I just did take offs and used some Goodyear hoses since I already knew this shit was gonna get moved again
Yah I did have to solder everything. The room was supposed to be empty too but they had the tanks in there already so I was climbing on these things trying to get all my piping done. It got to a point where I just did take offs and used some Goodyear hoses since I already knew this shit was gonna get moved again
"I am a rational animal who occupies the intermediary position between angel and beast"
"The upper class is afforded their position by the collective burden the underclass must carry for them"
**Summer Walker Crew**
Bookmarks
-
- Digg
-
- del.icio.us
-

- StumbleUpon
-
-
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts